College service notices

Service notice information

Electrical shutdown at Doon: September 3 to September 4, 2022

All buildings of the Doon campus will be closed due to an electrical shutdown on Saturday, September 3 from 6 a.m. until Sunday, September 4 at 10 p.m. Students and employees will not have access to the campus buildings during this time. The campus will be closed and there will be no utility power. Emergency power will be operational. This shutdown is required for a generation upgrade, and to replace the electrical meter by Kitchener-Wilmot hydro.

Construction at Doon campus A-wing: October 25, 2021 to August 2022

Due to construction in the A-wing at Doon, the 2A200 corridor will be closed from October 25, 2021 to August 2022. During the closure, there will be no access to doors 1 or 2. Employees and students are reminded to use alternative corridors and follow posted signage during construction. As a result of the construction, parking lot 6 will also be closed until August 2022. Parking lots will continue to be monitored by Security Services – employees are reminded to follow posted signage as well as parking and traffic regulations while on site.

Submitting a service notice

Fill out the service notice form to report a change in service.

COVID-19 information

As the COVID-19 pandemic evolves around the world and in our local community, Conestoga continues to adjust plans based on the guidance provided by our local Public Health authority.

Refer to COVID-19 for more information.